Copper mine dust recovery value

China's copper reserves are very rich. In recent years, the copper industry has developed rapidly. However, the natural and man-made loss of copper in China's industrial production process is more serious. If the ore is lost, the recovery rate is not high. In the loss of copper ore, a large part of the ore is lost by the exhaust fan used for dust prevention. The recycling of dust in China's copper mines is often neglected, causing great losses and polluting the environment. The largest Dexing copper mine in the country has gradually realized this point. The second phase of the project dust can be rationally utilized comprehensively, and the annual income can be increased by more than 2.5 million yuan, effectively protecting the mine environment.

The second phase of Dexing Copper Mine processed 15,000 tons of ore per day. It was put into operation in November 1986. The original design was wet operation, and later changed to dry operation. The dust pollution was quite serious. The annual dust emission reached 83,160 tons. The dust contains 1.1% copper and 3.29% sulfur, which is 1-2 times higher than the content of each element in the original ore. Therefore, the dust has complete recycling value.

To this end, in the second half of 1987, Dexing Copper Mine invested 32,000 yuan, newly built empty steel chute 162.2 meters, concrete chute 89.7 meters, using the original washing mining concrete chute 135 meters, the second phase of the project 28 sets of dust remover The dust under the whole is discharged through these chutes into the φ45m thick pool that was originally used for washing, and then the sand pump is used to hit the special grinding and floating system to produce copper concentrate with an average recovery rate of 21.6%. Only copper and sulfur are recovered, and the annual profit can be more than 1.2 million yuan.

In addition, the original design of the dust collector water consumption of 5 m 3 / 10000 air volume, in addition to the dust and sewage combined with the surface water discharged to the outside of the factory, the actual dust collector water consumption of 15 m 3 / 10000 air volume, resulting in the drainage ditch often not smooth, so that the factory The internal sewage is up to 0.7 meters deep, which affects the normal production and pollutes the environment. To this end, all of the water is recycled and purified for recycling of the dust collector, thereby improving the environment, and the annual sewage discharge fee is 1.26 million yuan.

It can be seen that recycling dust can not only effectively utilize mineral resources, but also improve the mine environment, and the economic benefits are considerable.