3t 4ton Asphalt Distributor Asphalt Transport Tank Truck Asphalt Paver
Donghwa Phe Gaskets,Donghwa Gasket Heat Exchanger,Phe Spare Gasket For Donghwa,Donghwa Heat Exchangers Gaskets Dongguan Runfengda F&M Co., Ltd , https://www.rfdphe.com
Please let us know your specific requirements, and we will customize the truck for you accordingly.
Â
Our warranty period is 12 months or 8,000 km, whichever comes first.
Â
If you have such requirements, please contact me via phone at +86-13872885121.
There are three types with different features:
Normal type, operated manually, nozzles opened by hand,
Standard type, semi-automatic operation, spray amount controlled manually,
Intelligent model, fully computer-controlled. You can input desired spray amount and width on the panel, and it will spray automatically. Easier to operate. You can control each nozzle individually for more accurate spraying. Uses both Chinese and imported parts. ,
Specification of 3T 4Ton Asphalt Distributor, Asphalt Transport Tank Truck, Asphalt Paver
Truck Specification
Chassis model
Â
DFA1070SJ35D6
Overall dimensions
mm
6300*1980*2650
Â
Fact cubage
Ton
3
Â
Mass in working order
kg
Appro×3745(ref)
Â
Body internal dimensions
mm
TBD
Â
Wheel base
Â
3300
Engine
Displacement/power
3856mL/120HP
Â
Model
                  CY4102-C3C
Â
Type
4 stroke, turbocharged, water cooled, vertical direct line
Max speed
km/h
90
Tire specification
7.00-16
Drive seat
RHD
Electric system
24v
transmission
5 speed
Color
Identify by customer
                               Equipment Â
bitumen pump
KCB300 (300L/mins)
Deputy engine
Changchai 1105 12KW
Control system
By manual
Heating mode
Heat conducting oil , heat automatic
burner
G10 from Italy
Heat oil pump
40-25-160
Asphalt nozzle No
13nos
Working speed
1.5-7km/h
Function
Spray Width
4.5M
Asphalt spraying quantity
0.2-2.5L/M²
Spray medium
Hot Asphalt / Emulsified Asphalt / Modified Asphalt / Diluted Asphalt
Operating environmentt
Country road
Disadvantage
Asphalt nozzle opened manually,Spraying thickness is not uniform
Company certificate :
FAQ:
Â
Q1. Quality Control
A:We conduct quality control at every step during production and before shipping.
Q2. What are your payment terms?
A: T/T 30% deposit, and 70% before delivery. We'll show you photos of the products and packages before you pay the balance. LC terms are also acceptable.
Q3. What are your delivery terms?
A: EXW, FOB, CFR, CIF, DDU, DAP, etc.
Q4. How about your delivery time?
A: Generally, it takes 10 to 20 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
For standard products, delivery time is as follows:
Water tanker truck: 7 days
Fuel tanker trailer: 15-20 days
Garbage truck: 15 days
Sweeper road truck: 25 days
Wecker truck: 7-10 days
Suction sewage/Fecal truck: 7-15 days
Crane truck: 15 days
Refrigerator/Van truck: 7-15 days
Dump truck: 20 days
Concrete mixer truck: 7-25 days
LPG: 20-30 days
LED truck: 7-15 days
(The above is for left-hand drive chassis. If you need a right-hand drive chassis, the delivery time will be longer. Detailed terms are subject to the contract.)
Q5. Can you produce according to samples?
A: Yes, we can produce based on your samples or technical drawings. We can build molds and fixtures.
Q6. How do you ensure truck quality?
A: We have experienced workers and engineers who monitor quality throughout production and strictly follow state special truck technical specifications and safety production standards.
We have been in this industry for over 15 years, dealing with all kinds of special trucks and trailers.
PHE Spare Gasket For DONGHWA