The transportation department makes every effort to safeguard the legitimate rights and interests of migrant workers
Usage & Specification:
BWG3000 Chocolate Storage Tank is the special storage container for refined or ball milled chocolate pastes.It has electric heating and automatic temperature control.It enables the chocolate pastes being kept at a set temperature.Through heat preserving and stirring, it will lower the moisture content of the chocolate and improve its liquidity so as to have a longer shelf life and better taste.It can also be used for mixing and melting chocolate blocks for small batch production.
Model
Capacity
(L)
Stirring Speed (rpm)
Main Power (kW)
Heating Power (kW)
Machine Weight
(kg)
Outside Dimension
(mm)(Diameter) *(Height)
BWG3000
3000
23.5
5.5
9
2000
Φ1900*2150
Chocolate Storage Tank,Chocolate Holding Tank,Chocolate Tank,Chocolate Storage Holding Tank Suzhou Lejoy Machinery Co., Ltd. , https://www.choco-machine.com On January 11, Vice Minister of Transport Feng Zhenglin said in attending the video conference on the work of wage payment for migrant workers before the Spring Festival in 2013 that transport authorities at all levels must fully safeguard the legitimate rights and interests of migrant workers and take practical actions to The spirit of the 18th National Congress of the Communist Party of China was put into practice so that the majority of migrant workers could enjoy a happy Chinese New Year with their hard-working labor income.
When the Ministry of Transport drafted and promulgated the Bidding Document for the Construction of Highway Engineering Standards, it had written the management requirements for peasant wage payment into the terms of the contract; in the credit evaluation work of the transportation construction market, the wage payment of migrant workers was the social responsibility of the owners and the enterprises. It has been included in the evaluation system; at the end of 2012, the Ministry of Transport printed and issued the Opinions on Further Completing Work Related to Payment and Management of Peasant Workers in the Construction of Highway Water Transportation Projects, and proposed clear rules for improving the system, fulfilling responsibilities, and strengthening supervision. Claim.
Feng Zhenglin pointed out that all localities must establish a "safeguard mechanism for construction companies, supervision of construction units, and supervision of competent authorities." In accordance with the principle of "who contracted, who is responsible," and "who manages the project, who will prevent default," the construction company will subcontract The irresponsible management responsibilities and joint discharge responsibilities that companies and related labor service units pay for migrant workers' wages are put in place to prevent the peasant worker wage arrears from rebounding.