2X vacuum pump assembly considerations
1, the assembly, the friction surface should be coated with a clean suction oil. Search Keyword: More Pump Technical Articles PVC Pipe Fitting Mould,PVC Mould,PVC Pipe Mould,Elbow Mould,Tee Mould TAIZHOU HUANGYAN SOLIDCO MOULD CO.,LTD , https://www.solidcomould.cn
2, remember the original parts of the assembly position, reduce running time.
3, fasteners should be relaxed, fastening force should be symmetrical.
4, for wear parts should be checked, and if appropriate, trimming or replacement.
5, the final assembly, you can pump a small amount of oil into the air intake, then turn around with your hand, turn about, the hand feel should be resistance symmetry, no obvious blocking phenomenon.
6, observe the operation of the pump port and the ultimate vacuum measurement, different requirements, to be mediation.
7, in the maintenance of the pump at the same time, also answer to the system of a management road, mechanical and electrical valves to be liquidated overhaul.