How to monitor the installation project construction fee?

How does the monitoring and installation company generally charge the camera during the installation process? This article explains how the construction fee is usually charged if the contractor or the monitoring team does not include the materials.

First, according to the duration calculation.
In accordance with the duration of the monitoring project, the tendering and bidding projects are all completed. The construction team, according to the construction period, Party A fixed to the construction company or the construction team a certain construction costs, the two sides signed an agreement or contract in accordance with the agreement, and then settled in accordance with the construction period.
Second, according to the engineering point calculation.
The number of points for installation of surveillance cameras is calculated, the total number of installations, combined with the length of the line, multiplied by an average number to estimate the total construction cost.
There are many projects according to the needs, in the planning of the plan to consider when the area being monitored is a fixed-point camera or a PTZ rotation, such as high-speed ball, infrared high-speed ball and so on.
General fixed point to install the hemisphere or gun camera, moving point will install the PTZ decoder, lens controller, camera shields, etc., or will directly use the high-speed ball to monitor. Therefore, the fixed point is generally cheaper than the moving point.
Third, install labor costs calculations.
Some small security monitoring projects do not require a lot of people for construction. The construction process is short and the construction period is short. The three or five workers can complete the entire project. In this case, many companies directly pass the wages to the construction personnel. , monthly salary and so on.
Fourth, according to the percentage of engineering equipment.
The security industry has a common practice, and many companies appear to report monitoring plans, but also directly according to the overall product cost, multiplied by a certain percentage of the project business profits, there is the tax is also calculated according to the total amount of engineering equipment.
V. Calculated according to the price agreed by both parties.
Party A and Party B calculate through the agreed other price agreements.

Magnetic screw pump

Magnetic screw pump,High Quality Magnetic screw pump,Magnetic screw pump Details, CN

Botou Honghai Pump Co.,Ltd , http://www.pumphonghai.com